PROJOY RSD Solution Improving Solar Building Safety


As a leading manufacturer of PV safety products in ChinaPROJOY offers a full rapid shutdown solution to deliver unmatched safety, simplicity and efficiency for solar installations, including String-level Firefighter Safety Switch (PEFS-EL series) and DC24V Module-level Rapid Shutdown (PEFS-PL Series). 

 

Unlike conventional solutions, PROJOY Module-level RSD activates via grid-powered supply, eliminating dependency on PV module operation. As long as the grid is energized, the RSD remains ready for immediate deployment.

The String-level Firefighter Safety Switch can reduce the voltage in the array to the safe level (below 80V) within 30 seconds. In addition, with built-in temperature sensor, the device can immediately take actions when the temperature exceeds 85°C, automatically shut down and cut off the DC power. Thus, it is crucial to have such device installed to solar panels for public places. 

Seamlessly integrates with all mainstream inverters, our RSD ensures adaptability across diverse PV system configurations without retrofitting and create a safe rescue environment for firefighters, reduce fire losses, and ensure the safety of people and property.

PROJOY Rapid Shutdown solution has gradually became popular in European countries such as Germany and UK, as well as Southeast Asian countries like Thailand and the Philippines. Today, the company is a first-tier brand in Europe and Asia-pacific markets.

More News

Mar 13,2025

PV Combiner Box: A Vital Component in Solar Power Systems

Solar energy systems rely on a network of components to efficiently convert sunlight into usable electricity. One critical yet often overlooked device in this chain is the photovoltaic (PV) combiner box. This article explains what a PV combiner box does, how it works, and why it is essential for both safety and performance in solar installations.
View Detail

Feb 18,2025

Construction of PROJOY New Factory Begin

On February 18, the groundbreaking ceremony for PROJOY’s new factory was held in Xiangcheng District, Suzhou.
View Detail

Jan 26,2025

Construction of PROJOY’s New Facility Is Underway

We are pleased to announce that the construction of PROJOY’s new factory will start right after the Chinese Spring Festival 2025. As the first “Constructing Immediately After Land Acquisition” project to be implemented in Suzhou-Xiangcheng Cooperation Zone in 2025, it covers a total area of 25 acres (33,014 square meters) and will include PROJOY's offices, production lines and warehouses.
View Detail

SEARCH

%{tishi_zhanwei}%